The Path to Zero: ABB, Ballard Progress Work on High-power Fuel Cell Concept
The Path to Zero: ABB, Ballard Progress Work on High-power Fuel Cell Concept
February 23, 2022
US to Award $450 Million Port Infrastructure Development Grants
US to Award $450 Million Port Infrastructure Development Grants
February 23, 2022

Indefinite Quantity Contracts, Design Bid Build for the Great Lakes and Ohio River Division

Indefinite Quantity Contracts, Design Bid Build for the Great Lakes and Ohio River Division

The U.S. Army Corps of Engineers’ Huntington District intends to award “Indefinite Delivery Indefinite Quantity Contracts for Design Bid Build Marine-Based Construction Projects” in the Rivers Districts of the Great Lakes and Ohio River Division.

The U.S. Army Corps of Engineers’ Huntington District intends to award “Indefinite Delivery Indefinite Quantity Contracts for Design Bid Build Marine-Based Construction Projects” in the Rivers Districts of the Great Lakes and Ohio River Division.The U.S. Army Corps of Engineers’ Huntington District intends to award “Indefinite Delivery Indefinite Quantity Contracts for Design Bid Build Marine-Based Construction Projects” in the Rivers Districts of the Great Lakes and Ohio River Division.MarineLink NewsRead More

Leave a Reply

Your email address will not be published. Required fields are marked *

Generated by Feedzy
%d bloggers like this: